You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan TPS3R di Rawasari Capai 50 Persen

TPS3R Construction in Rawasari Keeps Being Accelerated

The Central Jakarta Environment Agency continues to speed up the construction of a Reuse Reduce and Recycle (TPS3R) Waste Processing Site on Jalan Rawasari, Rawasari Cempaka Putih.

It will be executed on 1,000-square-meter-wide land

Pollution and Environmental Damage Control Division Head, Enrile Indro Prasetyo said TPS3R is a waste processing system with more effective and efficient waste chopping and compost sieving machine technology.

Until now, its construction has entered the foundation installation stage with the roof completed.

Kelapa Island Residents! Do Not Burn Garbage Carelessly

"We're preparing a location to place the machines," he said, Thursday (11/2).

He explained that next week, four TPS3R machines would be brought to the location. They were a conveyor machine, a back opener machine, an automatic waste sorting machine, and an organic waste biodrying machine.

"It will be executed on 1,000-square-meter-wide land. The location is right in front of our office," he explained.

According to him, the construction and procurement of TPS3R supporting equipment cost Rp 9.7 billion from APBD funds with details of Rp 4.2 billion for physical buildings and Rp 5.5 billion for equipment procurement.

"Hopefully, it can reduce the volume of waste in Bantar Gebang. Because the waste that is thrown away will only be residue," he stated.

Linked News
Popular News indeks
  1. Jakarta's Central Statistics Agency Records Inflation at 0.63 Percent

    access_time02-03-2026 remove_red_eye866 personFolmer
  2. Liquor Raids in East Jakarta Continue to Be Intensified

    access_time02-03-2026 remove_red_eye646 personNurito
  3. Pramono: Jakarta Ready to Pay Out Holiday Bonus to ASN

    access_time04-03-2026 remove_red_eye550 personDessy Suciati
  4. Transjakarta`s Blok M–Soetta Airport Route Served by Metrotrans Low Entry Buses

    access_time05-03-2026 remove_red_eye488 personAldi Geri Lumban Tobing
  5. Commission D Prioritizes High-Impact Programs for Residents

    access_time04-03-2026 remove_red_eye483 personFakhrizal Fakhri